2RARE84s |
10-13-2008 07:34 AM |
My long weekend...
So, my weekend consisted of working on the T/A for at least 10 hours... I did all 4 brake calipers, rotors, pads (of course), E brake cables, wheel bearings, front left brake line, spark plugs, distributor cap, rotor, plug wires, lower radiator hose, and a new K&N air filter... I think that is it.
It wouldn't have taken so long, but I had to keep going back to the parts store for random crap... Saturday was just one of those days, I was at the parts store 3 times.
Now all that is left is replacing some vacuum lines and maybe swap the exhaust, then she is off to Paul at RPM for rust work.
|