if 30 people help me and I win the lottery then sure, will do
Still need to do
Complete Block
-install heads (waiting for TTP to finish them, hopefully today)
-make adapter for oil pressure sender
-make adapter for water temp sender
-attach harness
-install flywheel and clutch
Finish Engine Bay
- Torque down subframe, control arms, and steering rack
- Install Wilwood clutch master cyl
Cabin
- Install SGI Speedo Adapter
- Cut 1 1/4" out of the shifter openting for T56
Wiring
- Mate LS1 harness to RX7 for fan relays, back up lights, etc
Final Pieces
- install cooling system
- run heating hoses
- Install new fuel lines
- Install accessories
- Install intake manifold & Injectors/Rail
- Run wiring harness
- Install trany brace and weld seams
- Take the car to a exhaust shop and have long tubes mated to catback
and there is probably 20 other things Im forgetting right now. lol