Quote:
Originally Posted by camaroracer1992
same thing with my 8 point roll bar..... i thought id have it tacked in about 3 hrs..... took like 2 weeks after all the cutting, grinding, etc.... id never buy any of their stuff again if it was me
|
S+W cage here and same thing, it was notched, but we had to re-notch almost every tube. But I still like what I've seem of their parts. The 3rd gen sway bar kit looks like a very nice peice!
__________________
93Z M6 Black: The 385 Lives! Supercharged, 3-core front mount intercooler, GTP heads, 3:73's, Street twin clutch, Jethot Longtubes, Mufflex 4" catback/spintech, S+W cage, Spohn Suspenion, Yada Yada Yada
1) Build it
2) Race it
3) Break it
4) Repeat!!!
|