View Single Post
Old 01-28-2014, 09:20 PM   #11
198esp1
 
198esp1's Avatar
 
Join Date: Dec 2005
Posts: 396
iTrader: (2)
first event is usually in April ,the schedule isn't out yet. most of the heavy engineering is done front suspension , rear suspension, pedals , cage work,ect is all done. need to fab up some exhaust, gauges, pumb the dry sump ,fuel system, brakes. Get the shocks re-valved and some more odds and end that I'm forgetting .
__________________
2012 northeast divisional champion
2012 nnjr scca cp champion
198esp1 is offline   Reply With Quote