Todays objectives are to get the Y pipe VS TQ arm situation solved and get the Drive shaft in. Also throw the O2s in. If im able to figure that out without much trouble/time then im also going to throw the interior back in. And by interior i mean cluster.
The last length of battery cable should arrive tomorrow so today ill head to the store and pick up a battery.
Anyone got a "check off list" i should run down before i crank this slut
__________________
99 Z28 - SBE LS1/60e
Motor - 10.84 @ 128 - 1.47 60'
Nitrous - 10.16 @ 132 - 1.40 60"
|