Lines Cut, Cleaned and ready for fittings.
Straight fitting for rear lines to T connection.
Front Lines formed and put to the T Connector
T connector to Line Lock
Current state.
today if i have time ill do the rear lines to the T and from the T to the proportioning valve. Then once that is done id like to devise some sort of strap to hold the lines against the frame rail. Prob just a piece of flat aluminum stock and utilize the bolt holes from the ABS unit bracket