Quote:
Originally Posted by thedugan
Thanks guys. If my concrete is thick enough im going with a 2post. If not I have to go with the 4 post. Not redoing the concrete. Don't have time to wait for the virus to lift so I can have a lift install party with my friends. Need an installer who can come and install asap. Ill call Greg Smith and see who they have that can install over the next few weeks.
|
My friend Dave got his via Greg Smith