View Single Post
Old 12-03-2017, 01:59 PM   #14
Franksride
 
Franksride's Avatar
 
Join Date: Oct 2017
Posts: 12
iTrader: (0)
Almost ready to pull engine

All that's left to do is to cut the rusted exhaust bolt flanges. Gonna try the dremel since it's smaller. If not the 3" angle grinder is next. I'm hoping I can start the complete break line install by next week after we pull the engine out. Lots of de-greaser and elbow grease to remove all the sludge. After the break lines are in I need to figure out where the cut outs for the new clutch pedal go. We're swapping the the 305 and TH350 with a new 4 bolt and 5 speed manual. Gonna be a while before this thing runs. Another work stopper is the rear. It's a 2.41 posi and I'm researching changing the the gears to 2.73's since I'm told they are compatible with a series 2 carrier.

Last edited by Franksride; 12-03-2017 at 02:02 PM.
Franksride is offline   Reply With Quote