I charge $180 to install 4th gen 2 point connectors. This includes, prepping and painting the surrounding floor. At my labor rate it equals 3 hours labor.. To do the job correctly it takes that long. The electric and rent has to get paid some how..
__________________
JSSPEEDANDCUSTOM.COM
Last edited by JSPERFORMANCE; 12-29-2007 at 05:31 PM.
|