View Single Post
Old 04-24-2015, 12:34 PM   #21
IROCZman15
10 Second Club / Meet Coordinator
 
IROCZman15's Avatar
 
Join Date: Dec 2004
Location: Roxbury, NJ
Posts: 2,100
iTrader: (8)
Tim nailed it right on the head with his above writeup. This will be our teams first race/event so we are in total thrash mode the next few weeks. Full weekend of wrenching for most of the guys on my team this weekend. I'm actually heading to the garage in about 2 hours to assist. Again, I don't want to reveal too many details on the car/project yet, but we have the cage 95% in, car "painted", engine running (a few leaks to contend with), exhaust run, seat installed, brakes, wheels tires, brake ducts setup, fuel system plumbed and tested, cooling system setup (need new water pump), etc. A lot of the next stuff these two weeks involves wiring EVERYTHING, tuning the engine better, testing that the transmission even works, sorting out kinks, grabbing a full trailer and loading up all the gear/tools/ car, etc totally a fun project, but not as much with the deadline only 2 weeks away.
__________________
1987 IROC-Z - modified

IROCZman15 is offline   Reply With Quote