Quote:
Originally Posted by IROCZman15
you are on a roll with the work recently man! great progress, keep it up.
|
I really want to be close to drivable by the end of September, and now that this three month heat wave is almost over I can finally get some stuff done. I probably won't be finished by then, but I'd like to have the rust underneath fixed, sub frames welded in, floor painted, wiring harness done and engine back in the car by the end of the month.
Just have to go out there every night and get one or two small things done every night and I'll be there before I know it. I actually wrote it my list, but some things take some logistics planning so I don't have to undo and redo work.
The rust repair has me dreading that work though. I have a five/four day weekend this coming, so I think I can get pretty far on the total floor work by the end of it